Section 2                  Accounting and constructive



This section of the project is the most difficult and responsible. It is tested strength, stability projected structures and their reliability.

Graphic part of the section is performed in a stage of working drawings, designs calculated. All reinforcing products, inserts, mounting tabs must be drawn separately, with an indication of the class of the steel and sizes. They should be presented specification and sample fittings and material consumption by 1 element.

Explanatory Note in the amount of 15-20 pages should contain the following calculations:

- Determination of the depth of the sole foundation for the outer walls;

- To calculate and design elements 2 (bendable, compressed and basement).

List of calculated elements is given in Annex №1.

The calculation of each type structures should comprise:

a) general information on the calculated design with a choice of materials;

b) the collection of loads in a tabular form;

c) design scheme;

g) if appropriate static analysis;

d) Calculation of the elements 1 and 2 groups of limit states.

 

Section 3          Organizational - technological

The graphics of this section is developed within the scope of 3 sheets

It comprises:

- Manufacturing plan for one type of construction work;

- Calendar or roadmap;

- Motion graphics of work force;

- Motion graphics of machines and mechanisms;

- Delivery of graphics and materials flow;

- Instructions for the production of works and safety;

- Technical and economic parameters to the schedule;

- A network schedule of manufacturing plan;

- The calculation of labor costs on operation flow chart.

- A statement of the tools, equipment and materials.

- Development of the general plan with the technical and economic indicators.

The explanatory note is made in the amount of 30-35 pages and contains the following sections:

- General part indicating the source data;

- Design schedule:

a) The calculation of the volume of work;

b) The choice of methods of production of major construction works;

c) determination of the need for labor, materials, designs, cost of computer time;

g) network of schedule of works.

- Design of building general plan in the calculations:

a) The calculation of assembling vehicles;

b) determining the need for warehouses, temporary structures;

c) estimates of supply of construction: electricity, water supply;

- Description general plan;

- In the explanatory note to the routing of the need to strike-questions:

a) The calculation of the volume of work

b) the choice and justification of the action taken to implement the work of machines and mechanisms;

c) the selection and support of their work methods of production;

g) determining the volume of work;

d) determination of the need for material and technical resources;

e) calculation of the composition of a comprehensive brigade, calculation of labor costs for all works, at least 4, the development schedule of works.

- Occupational safety and fire safety.

- Calculation of transport needs on the two types of transport materials.

- Calculation of the resources required by general plan.

Section 4                                         Research

The objectives put forward by governmental personnel before modern production engineer -, are so complex that their solution requires creativity, research skills. In this regard, a modern specialist list must possess not only the necessary amount of basic and specialized knowledge, but also certain skills of the creative solution of practical problems, constantly improve their skills, adapt quickly to changing conditions.

The research work of students at course and graduation project associated with the development of special sections with elements of scientific research and studies carried out in the process of solving the real problems of specific businesses. Such graduation projects can end with the introduction and in this sense, are indeed real.

The graphics of this section can be developed within the scope of the 1st sheet and contain:

- Data on the comparative performance of the proposed issues incorporated;

- The data used for the analysis of research methods;

- The results of research projects;

The explanatory note is made in the amount of 10-25 pages and contains the following information:

- A brief literature review;

- Methodology for the study:

a) the methodology of the research work;

b) analysis of the survey results;

c) comparative characteristics of the proposed activities;

 